SV CSG Lily Lake 2 LLC is a 2 MW Solar Photovoltaic asset in PJM Interconnection, currently Operating.
SV CSG Lily Lake 2 LLC is reported in Illinois since 2020 under SV CSG Lily Lake 2 LLC. Available operating and financial measures include 20.1% capacity factor and 4 GWh annual generation; $30.0/MWh reported energy value.
- Location
- Kane, Illinois
- Technology
- Solar Photovoltaic
- Owner / parent
- SV CSG Lily Lake 2 LLC
- Operator
- SV CSG Lily Lake 2 LLC
- Grid
- PJM Interconnection
- Plant ID
- 64330
What stands out
SV CSG Lily Lake 2 LLC is a 2 MW Solar Photovoltaic asset in Illinois with status Operating.
Latest annual operating measures report 20.1% capacity factor and 4 GWh annual generation.
Available financial measures include $30.0/MWh energy value.
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #294 of 462
- National rank
- #6043 of 7,971
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.