Query
Surplus; AMIL.TILT1-4
Type
Entity Briefing
Entity
Surplus; AMIL.TILT1-4
Generated
2026-10-06T22:06:45.315Z

Briefing on Surplus; AMIL.TILT1-4

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
188 MW
Proposed capacity
active
Current status
Solar
Technology
MISO
Market / region
2027-06-30
Proposed COD
Briefing/projectactive

Surplus; AMIL.TILT1-4 is a 188 MW Solar project in Illinois, currently active.

Proposed COD is 2027-06-30.

Queue ID
MISO-S1097
Location
Vermilion, Illinois
Technology
Solar
Market / region
MISO
Point of interconnection
Tilton Switchyard

What stands out

1

Surplus; AMIL.TILT1-4 is a 188 MW Solar project in Illinois with status active.

2

proposed COD is 2027-06-30.

Market and operating context

Queue date
2025-05-23
Proposed COD
2027-06-30

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Surplus; AMIL.TILT1-4 — verified asset snapshot

FieldValue
Queue IDMISO-S1097
LocationVermilion, Illinois
TechnologySolar
Market / regionMISO
Point of interconnectionTilton Switchyard
Queue date2025-05-23
Proposed COD2027-06-30