Briefing on SUNSHINE VALLEY SOLAR 1

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
90 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2026-12-31
Proposed COD
C06
Queue phase
Briefing/projectactive

SUNSHINE VALLEY SOLAR 1 is a 90 MW Solar+Battery project in Nevada, currently active.

The reported queue phase is C06. Proposed COD is 2026-12-31.

Queue ID
CAISO-993
Location
Nye, Nevada
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Valley Substation 138 kV

What stands out

1

SUNSHINE VALLEY SOLAR 1 is a 90 MW Solar+Battery project in Nevada with status active.

2

The reported queue phase is C06; proposed COD is 2026-12-31.

3

Latest linked story: “Historic Gemini Solar-Plus-Storage Project Now Fully Operational” (POWER Magazine, 2024-07-18).

Market and operating context

Queue date
2013-04-30
Proposed COD
2026-12-31
IA status
IA Executed
Study phase
C06
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

SUNSHINE VALLEY SOLAR 1 — verified asset snapshot

FieldValue
Queue IDCAISO-993
LocationNye, Nevada
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionValley Substation 138 kV
Queue date2013-04-30
Proposed COD2026-12-31
IA statusIA Executed