Briefing/projectactive
SUNSHINE VALLEY SOLAR 1 is a 90 MW Solar+Battery project in Nevada, currently active.
The reported queue phase is C06. Proposed COD is 2026-12-31.
- Queue ID
- CAISO-993
- Location
- Nye, Nevada
- Technology
- Solar+Battery
- Market / region
- CAISO
- Point of interconnection
- Valley Substation 138 kV
What stands out
1
SUNSHINE VALLEY SOLAR 1 is a 90 MW Solar+Battery project in Nevada with status active.
2
The reported queue phase is C06; proposed COD is 2026-12-31.
3
Latest linked story: “Historic Gemini Solar-Plus-Storage Project Now Fully Operational” (POWER Magazine, 2024-07-18).
Market and operating context
- Queue date
- 2013-04-30
- Proposed COD
- 2026-12-31
- IA status
- IA Executed
- Study phase
- C06
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.