Query
Sunlit Pines Solar SLF
Type
Entity Briefing
Entity
Sunlit Pines Solar SLF
Generated
2026-10-19T17:25:34.728Z

Briefing on Sunlit Pines Solar SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
207 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-09-12
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Sunlit Pines Solar SLF is a 207 MW Solar+Battery project in Texas, currently active.

Sunlit Pines Energy Center LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-12.

Queue ID
ERCOT-27INR0226
Location
Nacogdoches, Texas
Technology
Solar+Battery
Developer
Sunlit Pines Energy Center LLC
Market / region
ERCOT
Point of interconnection
Tap 138 kV 3342 Bayou Loco - 3341 Central Angelina County

What stands out

1

Sunlit Pines Solar SLF is a 207 MW Solar+Battery project in Texas with status active.

2

Sunlit Pines Energy Center LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-12.

Market and operating context

Queue date
2024-03-29
Proposed COD
2028-09-12
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Sunlit Pines Solar SLF — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0226
LocationNacogdoches, Texas
TechnologySolar+Battery
DeveloperSunlit Pines Energy Center LLC
Market / regionERCOT
Point of interconnectionTap 138 kV 3342 Bayou Loco - 3341 Central Angelina County
Queue date2024-03-29
Proposed COD2028-09-12