Query
SunEdison Ironwood State Prison
Type
Entity Briefing
Entity
SunEdison Ironwood State Prison
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on SunEdison Ironwood State Prison

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

1 MW
Capacity
Operating
Current status
2008
Operating since
1
Generators
11.4%
Capacity factor
1 GWh
Annual generation
Briefing/plantOperating

SunEdison Ironwood State Prison is a 1 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

SunEdison Ironwood State Prison is reported in California since 2008 under SunE CPA CDC2 LLC. Available operating and financial measures include 11.4% capacity factor and 1 GWh annual generation; $3757/kW reported CapEx.

Location
Riverside, California
Technology
Solar Photovoltaic
Owner / parent
SunE CPA CDC2 LLC
Operator
SunE CPA CDC2 LLC
Grid
CAISO (California)
Plant ID
57007

What stands out

1

SunEdison Ironwood State Prison is a 1 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 11.4% capacity factor and 1 GWh annual generation.

3

Available financial measures include $3757/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#920 of 992
National rank
#7379 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.