Sunbelt Solar is a 82 MW Solar+Battery project in Texas, currently active.
Rose Hill Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-12-31.
- Queue ID
- ERCOT-23INR0222
- Location
- Kaufman, Texas
- Technology
- Solar+Battery
- Developer
- Rose Hill Solar LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 138kV 6902 Talty - 6801 Patton
What stands out
Sunbelt Solar is a 82 MW Solar+Battery project in Texas with status active.
Rose Hill Solar LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2026-12-31.
Latest linked story: “Grove GHC55 Telescopic Crawler Cranes Enable New Solar Panel Assembly Technique” (For Construction Pros, 2020-06-02).
Market and operating context
- Queue date
- 2021-03-16
- Proposed COD
- 2026-12-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.