Summerhill BESS is a 143 MW Batteries asset in ERCOT (Texas), currently Planned.
Summerhill BESS is reported in Texas under RIC Development, LLC. Available operating and financial measures include $1361/kW reported CapEx.
- Location
- Taylor, Texas
- Technology
- Batteries
- Owner / parent
- RIC Development, LLC
- Operator
- RIC Development, LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 68665
What stands out
Summerhill BESS is a 143 MW Batteries asset in Texas with status Planned.
Available financial measures include $1361/kW CapEx.
1 linked queue projects represent 143 MW of proposed capacity.
Latest linked story: “Broad Reach Power completes 200-MWh battery portfolio to support renewables on ERCOT grid” (Solar Power World, 2021-11-02).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #135 of 344
- National rank
- #295 of 994
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.