Briefing/projectactive
Straight Spur Wind is a 247 MW Wind project in Texas, currently active.
ENGIE IR Holdings LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-01.
- Queue ID
- ERCOT-27INR0384
- Location
- Andrews, Texas
- Technology
- Wind
- Developer
- ENGIE IR Holdings LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV 23876 Clear Fork -11157 Gardenale Switch
What stands out
1
Straight Spur Wind is a 247 MW Wind project in Texas with status active.
2
ENGIE IR Holdings LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-04-01.
4
Latest linked story: “Pattern People: Jake Hull, Panhandle Wind” (Pattern Energy, 2022-04-26).
Market and operating context
- Queue date
- 2024-12-19
- Proposed COD
- 2029-04-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.