Straight Spur Solar is a 252 MW Solar+Battery project in Texas, currently active.
ENGIE IR Holdings LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-01.
- Queue ID
- ERCOT-27INR0385
- Location
- Andrews, Texas
- Technology
- Solar+Battery
- Developer
- ENGIE IR Holdings LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV ClearFork (Bus #23876) to Gardenale Switch (Bus #11157)
What stands out
Straight Spur Solar is a 252 MW Solar+Battery project in Texas with status active.
ENGIE IR Holdings LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2029-04-01.
Latest linked story: “NextEra’s ‘game-changing’ Real Zero emissions goal spurs questions about hydrogen, demand-side management” (Utility Dive, 2022-08-03).
Market and operating context
- Queue date
- 2024-11-21
- Proposed COD
- 2029-04-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.