Query
Storrie Lake Solar Project
Type
Entity Briefing
Entity
Storrie Lake Solar Project
Technology
solar
Summary generated
Oct 10, 2026
First saved
Date not recorded

Briefing on Storrie Lake Solar Project

Entity Briefing

Summary generated Oct 10, 2026 (UTC).

Source dates used by this summary were not recorded.

2 MW
Capacity
Operating
Current status
2014
Operating since
1
Generators
23.0%
Capacity factor
3 GWh
Annual generation
Briefing/plantOperating

Storrie Lake Solar Project is a 2 MW Solar Photovoltaic asset in New Mexico, currently Operating.

Storrie Lake Solar Project is reported in New Mexico since 2014 under MSM Solar LLC. Available operating and financial measures include 23.0% capacity factor and 3 GWh annual generation; $10.8/MWh reported energy value.

Location
San Miguel, New Mexico
Technology
Solar Photovoltaic
Owner / parent
MSM Solar LLC
Operator
MSM Solar LLC
Grid
Public Service Company of New Mexico
Plant ID
58794

What stands out

1

Storrie Lake Solar Project is a 2 MW Solar Photovoltaic asset in New Mexico with status Operating.

2

Latest annual operating measures report 23.0% capacity factor and 3 GWh annual generation.

3

Available financial measures include $10.8/MWh energy value.

Market and operating context

Balancing authority
Public Service Company of New Mexico
NERC region
WECC
State rank
#110 of 122
National rank
#6496 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.