Briefing on Stinger Energy Storage

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-03-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Stinger Energy Storage is a 201 MW Battery project in Texas, currently active.

Stinger Energy Storage LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-03-01.

Queue ID
ERCOT-26INR0343
Location
Harris, Texas
Technology
Battery
Developer
Stinger Energy Storage LLC
Market / region
ERCOT
Point of interconnection
Tap Atascocita 138kV Substation (Bus # 40130) - Lake Houston (Bus #40820)

What stands out

1

Stinger Energy Storage is a 201 MW Battery project in Texas with status active.

2

Stinger Energy Storage LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-03-01.

Market and operating context

Queue date
2023-11-14
Proposed COD
2028-03-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Stinger Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0343
LocationHarris, Texas
TechnologyBattery
DeveloperStinger Energy Storage LLC
Market / regionERCOT
Point of interconnectionTap Atascocita 138kV Substation (Bus # 40130) - Lake Houston (Bus #40820)
Queue date2023-11-14
Proposed COD2028-03-01