Stillwater Hydro Electric Project is a 3 MW Conventional Hydroelectric asset in NYISO (New York), currently Operating.
Stillwater Hydro Electric Project is reported in New York since 1993 under GR Catalyst One, LLC. Available operating and financial measures include 36.3% capacity factor and 11 GWh annual generation; $2294/kW reported CapEx.
- Location
- Saratoga, New York
- Technology
- Conventional Hydroelectric
- Owner / parent
- GR Catalyst One, LLC
- Operator
- GR Catalyst One, LLC
- Grid
- NYISO (New York)
- Plant ID
- 54395
What stands out
Stillwater Hydro Electric Project is a 3 MW Conventional Hydroelectric asset in New York with status Operating.
Latest annual operating measures report 36.3% capacity factor and 11 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Market and operating context
- ISO / market
- NYISO (New York)
- Balancing authority
- New York Independent System Operator
- NERC region
- NPCC
- State rank
- #98 of 165
- National rank
- #1017 of 1,462
Why it matters
For this asset in NYISO (New York), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.