Briefing/projectactive
Stewart Grady BESS is a 151 MW Battery project in Texas, currently active.
Grady BESS is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-19.
- Queue ID
- ERCOT-25INR0396
- Location
- Martin, Texas
- Technology
- Battery
- Developer
- Grady BESS
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 11368 Expanse Switch – 23841 Sale Ranch
What stands out
1
Stewart Grady BESS is a 151 MW Battery project in Texas with status active.
2
Grady BESS is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-04-19.
Market and operating context
- Queue date
- 2023-05-26
- Proposed COD
- 2028-04-19
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.