Briefing on Stewart Grady BESS

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
151 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-04-19
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Stewart Grady BESS is a 151 MW Battery project in Texas, currently active.

Grady BESS is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-19.

Queue ID
ERCOT-25INR0396
Location
Martin, Texas
Technology
Battery
Developer
Grady BESS
Market / region
ERCOT
Point of interconnection
Tap 138kV 11368 Expanse Switch – 23841 Sale Ranch

What stands out

1

Stewart Grady BESS is a 151 MW Battery project in Texas with status active.

2

Grady BESS is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-04-19.

Market and operating context

Queue date
2023-05-26
Proposed COD
2028-04-19
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Stewart Grady BESS — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0396
LocationMartin, Texas
TechnologyBattery
DeveloperGrady BESS
Market / regionERCOT
Point of interconnectionTap 138kV 11368 Expanse Switch – 23841 Sale Ranch
Queue date2023-05-26
Proposed COD2028-04-19