Query
Sterlington Solar
Type
Entity Briefing
Entity
Sterlington Solar
Generated
2026-10-05T10:17:28.976Z

Briefing on Sterlington Solar

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
49 MW
Capacity
Operating
Current status
2026
Operating since
1
Generators
Briefing/plantOperating

Sterlington Solar is a 49 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Operating.

Sterlington Solar is reported in Louisiana since 2026 under Entergy. Available operating and financial measures include $1543/kW reported CapEx.

Location
Ouachita, Louisiana
Technology
Solar Photovoltaic
Owner / parent
Entergy
Operator
Entergy Louisiana LLC
Grid
MISO (Midcontinent)
Plant ID
66681

What stands out

1

Sterlington Solar is a 49 MW Solar Photovoltaic asset in Louisiana with status Operating.

2

Available financial measures include $1543/kW CapEx.

3

Latest linked story: “Entergy Louisiana opens new solar farm in Sterlington” (KNOE, 2025-12-28).

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
SERC
State rank
#20 of 33
National rank
#1480 of 7,971

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Sterlington Solar — verified asset snapshot

FieldValue
LocationOuachita, Louisiana
TechnologySolar Photovoltaic
Owner / parentEntergy
OperatorEntergy Louisiana LLC
GridMISO (Midcontinent)
Plant ID66681
ISO / marketMISO (Midcontinent)
Balancing authorityMidcontinent Independent Transmission System Operator, Inc..