Steppe Reserve Storage is a 52 MW Battery project in Texas, currently active.
KCE TX 25, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-01-01.
- Queue ID
- ERCOT-23INR0164
- Location
- Dimmit, Texas
- Technology
- Battery
- Developer
- KCE TX 25, LLC
- Market / region
- ERCOT
- Point of interconnection
- 8283 Asherton 138 kV
What stands out
Steppe Reserve Storage is a 52 MW Battery project in Texas with status active.
KCE TX 25, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-01-01.
Latest linked story: “A Major Shift: San Miguel Electric plans to replace lignite coal with solar and geothermal energy | The Progress” (SouthTexasNews.com, 2024-09-19).
Market and operating context
- Queue date
- 2021-01-25
- Proposed COD
- 2028-01-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.