Query
Steppe Reserve Storage
Type
Entity Briefing
Entity
Steppe Reserve Storage
Generated
2026-10-11T18:39:08.339Z

Briefing on Steppe Reserve Storage

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
52 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-01-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Steppe Reserve Storage is a 52 MW Battery project in Texas, currently active.

KCE TX 25, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-01-01.

Queue ID
ERCOT-23INR0164
Location
Dimmit, Texas
Technology
Battery
Developer
KCE TX 25, LLC
Market / region
ERCOT
Point of interconnection
8283 Asherton 138 kV

What stands out

1

Steppe Reserve Storage is a 52 MW Battery project in Texas with status active.

2

KCE TX 25, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-01-01.

4

Latest linked story: “A Major Shift: San Miguel Electric plans to replace lignite coal with solar and geothermal energy | The Progress” (SouthTexasNews.com, 2024-09-19).

Market and operating context

Queue date
2021-01-25
Proposed COD
2028-01-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Steppe Reserve Storage — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0164
LocationDimmit, Texas
TechnologyBattery
DeveloperKCE TX 25, LLC
Market / regionERCOT
Point of interconnection8283 Asherton 138 kV
Queue date2021-01-25
Proposed COD2028-01-01