Query
Steelhead Energy Storage
Type
Entity Briefing
Entity
Steelhead Energy Storage
Generated
2026-10-17T12:10:09.003Z

Briefing on Steelhead Energy Storage

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
194 MW
Capacity
Planned
Current status
1
Generators
Briefing/plantPlanned

Steelhead Energy Storage is a 194 MW Batteries asset in ERCOT (Texas), currently Planned.

Steelhead Energy Storage is reported in Texas under GRS BESS Texas Seven, LLC. Available operating and financial measures include $1361/kW reported CapEx.

Location
Fannin, Texas
Technology
Batteries
Owner / parent
GRS BESS Texas Seven, LLC
Operator
GRS BESS Texas Seven, LLC
Grid
ERCOT (Texas)
Plant ID
67798

What stands out

1

Steelhead Energy Storage is a 194 MW Batteries asset in Texas with status Planned.

2

Available financial measures include $1361/kW CapEx.

3

1 linked queue projects represent 192 MW of proposed capacity.

4

Latest linked story: “Steelhead commissions first utility-scale wind farm” (reNEWS.BIZ, 2025-11-25).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#96 of 344
National rank
#223 of 994

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Steelhead Energy Storage — verified asset snapshot

FieldValue
LocationFannin, Texas
TechnologyBatteries
Owner / parentGRS BESS Texas Seven, LLC
OperatorGRS BESS Texas Seven, LLC
GridERCOT (Texas)
Plant ID67798
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.