Star Dairy Solar is a 126 MW Solar+Battery project in Texas, currently active.
Star Dairy Solar LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-04-03.
- Queue ID
- ERCOT-25INR0164
- Location
- Lamar, Texas
- Technology
- Solar+Battery
- Developer
- Star Dairy Solar LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 1692 PARIS_SW1_5 -- 11699 WOODARD_5
What stands out
Star Dairy Solar is a 126 MW Solar+Battery project in Texas with status active.
Star Dairy Solar LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2027-04-03.
Latest linked story: “X-Elio inks VPPAs with Cisco, Biogen, others for 172 MW of US solar” (Renewables Now, 2025-03-12).
Market and operating context
- Queue date
- 2022-11-23
- Proposed COD
- 2027-04-03
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.