Query
Stampede Solar Hybrid
Type
Entity Briefing
Entity
Stampede Solar Hybrid
Technology
solar
Generated
2026-10-17T10:28:32.989Z

Briefing on Stampede Solar Hybrid

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
328 MW
Capacity
Operating
Current status
2024
Operating since
2
Generators
18.8%
Capacity factor
541 GWh
Annual generation
Briefing/plantOperating

Stampede Solar Hybrid is a 328 MW Batteries asset in ERCOT (Texas), currently Operating.

Stampede Solar Hybrid is reported in Texas since 2024 under Stampede Solar Project LLC. Available operating and financial measures include 18.8% capacity factor and 541 GWh annual generation; $1361/kW reported CapEx.

Location
Hopkins, Texas
Technology
Batteries, Solar Photovoltaic
Owner / parent
Stampede Solar Project LLC
Operator
Stampede Solar Project LLC
Grid
ERCOT (Texas)
Plant ID
67762

What stands out

1

Stampede Solar Hybrid is a 328 MW Batteries asset in Texas with status Operating.

2

Latest annual operating measures report 18.8% capacity factor and 541 GWh annual generation.

3

Available financial measures include $1361/kW CapEx.

4

Latest linked story: “Nestlé invests in 326 MW Texas solar project” (pv magazine USA, 2024-08-26).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#53 of 378
National rank
#118 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.