SR Bacon II Solar is a 115 MW Solar project in Georgia, currently active.
The reported queue phase is In Progress (unknown study). Proposed COD is 2027-11-30.
- Queue ID
- GTC-GI-185
- Location
- Bacon, Georgia
- Technology
- Solar
- Market / region
- Southeast
- Point of interconnection
- Offerman - Douglas 230 kV TL
What stands out
1
SR Bacon II Solar is a 115 MW Solar project in Georgia with status active.
2
The reported queue phase is In Progress (unknown study); proposed COD is 2027-11-30.
Market and operating context
- Queue date
- 2023-09-28
- Proposed COD
- 2027-11-30
- IA status
- In Progress (unknown study)
- Study phase
- In Progress (unknown study)
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.