Spurland Solar II is a 202 MW Solar project in Texas, currently active.
Spurland Solar II is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-30.
- Queue ID
- ERCOT-29INR0195
- Location
- Dickens, Texas
- Technology
- Solar
- Developer
- Spurland Solar II
- Market / region
- ERCOT
- Point of interconnection
- 59908 Nova Prime 345 345kV
What stands out
1
Spurland Solar II is a 202 MW Solar project in Texas with status active.
2
Spurland Solar II is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-12-30.
Market and operating context
- Queue date
- 2025-11-05
- Proposed COD
- 2028-12-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.