Briefing/projectactive
Spinner Energy Storage is a 126 MW Battery project in Texas, currently active.
GCI Wolf Energy Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-06-01.
- Queue ID
- ERCOT-27INR0083
- Location
- Bee, Texas
- Technology
- Battery
- Developer
- GCI Wolf Energy Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- 8196 Poesta Substation 138kV
What stands out
1
Spinner Energy Storage is a 126 MW Battery project in Texas with status active.
2
GCI Wolf Energy Storage, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-06-01.
Market and operating context
- Queue date
- 2023-10-13
- Proposed COD
- 2027-06-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.