Query
SPIKES PEAK SOLAR
Type
Entity Briefing
Entity
SPIKES PEAK SOLAR
Technology
solar
Generated
2026-10-11T21:46:13.896Z

Briefing on SPIKES PEAK SOLAR

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
318 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2029-10-18
Proposed COD
C14
Queue phase
Briefing/projectactive

SPIKES PEAK SOLAR is a 318 MW Solar+Battery project in California, currently active.

The reported queue phase is C14. Proposed COD is 2029-10-18.

Queue ID
CAISO-1958
Location
Merced, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Quinto 230 kV

What stands out

1

SPIKES PEAK SOLAR is a 318 MW Solar+Battery project in California with status active.

2

The reported queue phase is C14; proposed COD is 2029-10-18.

3

Latest linked story: “EDFR and PSEI Launch Desert Quartzite Solar+Storage Project” (Energetica India Magazine, 2025-02-03).

Market and operating context

Queue date
2021-04-15
Proposed COD
2029-10-18
IA status
IA Executed
Study phase
C14
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

SPIKES PEAK SOLAR — verified asset snapshot

FieldValue
Queue IDCAISO-1958
LocationMerced, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionQuinto 230 kV
Queue date2021-04-15
Proposed COD2029-10-18
IA statusIA Executed