Query
Spier Falls
Type
Entity Briefing
Entity
Spier Falls
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Spier Falls

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

56 MW
Capacity
Operating
Current status
1924
Operating since
2
Generators
37.9%
Capacity factor
186 GWh
Annual generation
Briefing/plantOperating

Spier Falls is a 56 MW Conventional Hydroelectric asset in NYISO (New York), currently Operating.

Spier Falls is reported in New York since 1924 under Erie Boulevard Hydropower LP. Available operating and financial measures include 37.9% capacity factor and 186 GWh annual generation; $2294/kW reported CapEx.

Location
Saratoga, New York
Technology
Conventional Hydroelectric
Owner / parent
Erie Boulevard Hydropower LP
Operator
Erie Boulevard Hydropower LP
Grid
NYISO (New York)
Plant ID
2612

What stands out

1

Spier Falls is a 56 MW Conventional Hydroelectric asset in New York with status Operating.

2

Latest annual operating measures report 37.9% capacity factor and 186 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

4

Latest linked story: “Powerhouse at Spier Falls dam destroyed, company says” (NEWS10 ABC, 2024-09-17).

Market and operating context

ISO / market
NYISO (New York)
Balancing authority
New York Independent System Operator
NERC region
NPCC
State rank
#6 of 165
National rank
#279 of 1,462

Why it matters

For this asset in NYISO (New York), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.