Briefing on Spain Energy Center

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
141 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
Southeast
Market / region
2028-12-13
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Spain Energy Center is a 141 MW Solar+Battery project in Georgia, currently active.

The reported queue phase is Facility Study. Proposed COD is 2028-12-13.

Queue ID
GTC-GI-190
Location
Brooks, Georgia
Technology
Solar+Battery
Market / region
Southeast
Point of interconnection
Spain 230 kV Substation

What stands out

1

Spain Energy Center is a 141 MW Solar+Battery project in Georgia with status active.

2

The reported queue phase is Facility Study; proposed COD is 2028-12-13.

3

Latest linked story: “AES Indiana powers up 250-MW solar farm with 180-MWh BESS” (Renewables Now, 2026-03-09).

Market and operating context

Queue date
2024-01-09
Proposed COD
2028-12-13
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Spain Energy Center — verified asset snapshot

FieldValue
Queue IDGTC-GI-190
LocationBrooks, Georgia
TechnologySolar+Battery
Market / regionSoutheast
Point of interconnectionSpain 230 kV Substation
Queue date2024-01-09
Proposed COD2028-12-13
IA statusFacility Study