Briefing/projectactive
Spain Energy Center is a 141 MW Solar+Battery project in Georgia, currently active.
The reported queue phase is Facility Study. Proposed COD is 2028-12-13.
- Queue ID
- GTC-GI-190
- Location
- Brooks, Georgia
- Technology
- Solar+Battery
- Market / region
- Southeast
- Point of interconnection
- Spain 230 kV Substation
What stands out
1
Spain Energy Center is a 141 MW Solar+Battery project in Georgia with status active.
2
The reported queue phase is Facility Study; proposed COD is 2028-12-13.
3
Latest linked story: “AES Indiana powers up 250-MW solar farm with 180-MWh BESS” (Renewables Now, 2026-03-09).
Market and operating context
- Queue date
- 2024-01-09
- Proposed COD
- 2028-12-13
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.