Southside Energy is a 101 MW Battery project in Texas, currently active.
Southside Energy, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-31.
- Queue ID
- ERCOT-24INR0530
- Location
- Brazoria, Texas
- Technology
- Battery
- Developer
- Southside Energy, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 42960 Mustang Bayou - 42100 HUDSON ckt 4
What stands out
Southside Energy is a 101 MW Battery project in Texas with status active.
Southside Energy, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-12-31.
Latest linked story: “2021 winter storm exposed grid weakness; part of Texas’ solution is being built near S.A.” (San Antonio Express-News, 2026-01-16).
Market and operating context
- Queue date
- 2023-02-27
- Proposed COD
- 2028-12-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.