Query
Southside Energy
Type
Entity Briefing
Entity
Southside Energy
Generated
2026-10-20T02:29:06.530Z

Briefing on Southside Energy

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
101 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Southside Energy is a 101 MW Battery project in Texas, currently active.

Southside Energy, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-31.

Queue ID
ERCOT-24INR0530
Location
Brazoria, Texas
Technology
Battery
Developer
Southside Energy, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 42960 Mustang Bayou - 42100 HUDSON ckt 4

What stands out

1

Southside Energy is a 101 MW Battery project in Texas with status active.

2

Southside Energy, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-31.

4

Latest linked story: “2021 winter storm exposed grid weakness; part of Texas’ solution is being built near S.A.” (San Antonio Express-News, 2026-01-16).

Market and operating context

Queue date
2023-02-27
Proposed COD
2028-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Southside Energy — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0530
LocationBrazoria, Texas
TechnologyBattery
DeveloperSouthside Energy, LLC
Market / regionERCOT
Point of interconnectionTap 138kV 42960 Mustang Bayou - 42100 HUDSON ckt 4
Queue date2023-02-27
Proposed COD2028-12-31