Query
South Plains Wind Phase I
Type
Entity Briefing
Entity
South Plains Wind Phase I
ISO/RTO
spp
Technology
wind
Generated
2026-10-13T05:06:12.390Z

Briefing on South Plains Wind Phase I

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
200 MW
Capacity
Operating
Current status
2015
Operating since
1
Generators
38.7%
Capacity factor
677 GWh
Annual generation
Briefing/plantOperating

South Plains Wind Phase I is a 200 MW Onshore Wind Turbine asset in ERCOT (Texas), currently Operating.

South Plains Wind Phase I is reported in Texas since 2015 under Evergreen Wind, LLC. Available operating and financial measures include 38.7% capacity factor and 677 GWh annual generation; $1640/kW reported CapEx.

Location
Floyd, Texas
Technology
Onshore Wind Turbine
Owner / parent
Evergreen Wind, LLC
Operator
Evergreen Wind, LLC
Grid
ERCOT (Texas)
Plant ID
59384

What stands out

1

South Plains Wind Phase I is a 200 MW Onshore Wind Turbine asset in Texas with status Operating.

2

Latest annual operating measures report 38.7% capacity factor and 677 GWh annual generation.

3

Available financial measures include $1640/kW CapEx.

4

Latest linked story: “Xcel announces $1.6 billion investment in wind energy from South Plains, New Mexico” (Lubbock Avalanche-Journal, 2017-03-21).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#111 of 252
National rank
#323 of 1,442

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.