Sonoma Central Landfill Phase I is a 3 MW Landfill Gas asset in CAISO (California), currently Operating.
Sonoma Central Landfill Phase I is reported in California since 1993 under County of Sonoma Dept of Trnsp. Available operating and financial measures include 20.0% capacity factor and 6 GWh annual generation; $3495/kW reported CapEx.
- Location
- Sonoma, California
- Technology
- Landfill Gas
- Owner / parent
- County of Sonoma Dept of Trnsp
- Operator
- County of Sonoma Dept of Trnsp
- Grid
- CAISO (California)
- Plant ID
- 55752
What stands out
Sonoma Central Landfill Phase I is a 3 MW Landfill Gas asset in California with status Operating.
Latest annual operating measures report 20.0% capacity factor and 6 GWh annual generation.
Available financial measures include $3495/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #28 of 43
- National rank
- #174 of 282
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.