Query
Sommer
Type
Entity Briefing
Entity
Sommer
Generated
2026-10-12T00:31:03.873Z

Briefing on Sommer

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
2 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Sommer is a 2 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Under construction.

Sommer is reported in Illinois under Generate Capital. Available operating and financial measures include $1606/kW reported CapEx.

Location
Massac, Illinois
Technology
Solar Photovoltaic
Owner / parent
Generate Capital
Operator
Generate Capital
Grid
MISO (Midcontinent)
Plant ID
69215

What stands out

1

Sommer is a 2 MW Solar Photovoltaic asset in Illinois with status Under construction.

2

Available financial measures include $1606/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
State rank
#218 of 462
National rank
#5544 of 7,971

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Sommer — verified asset snapshot

FieldValue
LocationMassac, Illinois
TechnologySolar Photovoltaic
Owner / parentGenerate Capital
OperatorGenerate Capital
GridMISO (Midcontinent)
Plant ID69215
ISO / marketMISO (Midcontinent)
State rank#218 of 462