Briefing on Soluce Bravo Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
81 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2029-09-17
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Soluce Bravo Solar is a 81 MW Solar+Battery project in Texas, currently active.

BNPB1, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-09-17.

Queue ID
ERCOT-28INR0269
Location
Brown, Texas
Technology
Solar+Battery
Developer
BNPB1, LLC
Market / region
ERCOT
Point of interconnection
tap 345kV 1444 BROWN - 11441 CORN TRAIL SW CKT2

What stands out

1

Soluce Bravo Solar is a 81 MW Solar+Battery project in Texas with status active.

2

BNPB1, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-09-17.

Market and operating context

Queue date
2025-01-13
Proposed COD
2029-09-17
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Soluce Bravo Solar — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0269
LocationBrown, Texas
TechnologySolar+Battery
DeveloperBNPB1, LLC
Market / regionERCOT
Point of interconnectiontap 345kV 1444 BROWN - 11441 CORN TRAIL SW CKT2
Queue date2025-01-13
Proposed COD2029-09-17