Briefing/owner1 operating assets · 2 queue projects
Solterra includes 49 MW of operating capacity and 263 MW of proposed queue capacity in the current result.
1 operating plants span 1 states. The linked queue contains 2 projects totaling 263 MW. Solar is the largest operating technology group at 49 MW.
- Coverage
- 1 plants across 1 states
- Largest asset
- Highest Power Solar, LLC · 49 MW
- Leading technology
- Solar · 49 MW
- Queue pipeline
- 2 projects · 263 MW
What stands out
1
1 operating plants total 49 MW across 1 states.
2
Solar is the largest operating technology group at 49 MW across 1 plants.
3
Highest Power Solar, LLC is the largest returned operating asset at 49 MW.
4
2 queue projects total 263 MW of proposed capacity.
Market and operating context
- Largest state footprint
- North Carolina · 49 MW
- Technology concentration
- Solar represents 49 MW
- Development pipeline
- 2 projects · 263 MW
Why it matters
The operating footprint shows what exists today, while the queue pipeline and latest curated events show where the portfolio or market may be changing. Reading those layers together avoids treating proposed capacity as operating capacity.