Briefing/projectactive
Solgen Storage is a 150 MW Solar+Battery project in Texas, currently active.
Lampasas Hybrid Energy is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-08-30.
- Queue ID
- ERCOT-30INR0038
- Location
- Lampasas, Texas
- Technology
- Solar+Battery
- Developer
- Lampasas Hybrid Energy
- Market / region
- ERCOT
- Point of interconnection
- 7066 Adamsville 138kV
What stands out
1
Solgen Storage is a 150 MW Solar+Battery project in Texas with status active.
2
Lampasas Hybrid Energy is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-08-30.
Market and operating context
- Queue date
- 2025-04-25
- Proposed COD
- 2029-08-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.