Briefing/projectactive
Solar Star Bay City Storage is a 206 MW Battery project in Texas, currently active.
Solar Star Bay City Storage is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-02-27.
- Queue ID
- ERCOT-27INR0120
- Location
- Matagorda, Texas
- Technology
- Battery
- Developer
- Solar Star Bay City Storage
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV Conoco (#8138) – Black Cat (#80124)
What stands out
1
Solar Star Bay City Storage is a 206 MW Battery project in Texas with status active.
2
Solar Star Bay City Storage is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-02-27.
Market and operating context
- Queue date
- 2023-12-20
- Proposed COD
- 2029-02-27
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.