Query
Solar Carver 1 Hybrid
Type
Entity Briefing
Entity
Solar Carver 1 Hybrid
Technology
solar
Generated
2026-10-18T13:24:06.337Z

Briefing on Solar Carver 1 Hybrid

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
4 MW
Capacity
Under construction
Current status
2
Generators
Briefing/plantUnder construction

Solar Carver 1 Hybrid is a 4 MW Batteries asset in ISO New England, currently Under construction.

Solar Carver 1 Hybrid is reported in Massachusetts under Solar Carver 1, LLC. Available operating and financial measures include $1361/kW reported CapEx.

Location
Plymouth, Massachusetts
Technology
Batteries, Solar Photovoltaic
Owner / parent
Solar Carver 1, LLC
Operator
Solar Carver 1, LLC
Grid
ISO New England
Plant ID
63541

What stands out

1

Solar Carver 1 Hybrid is a 4 MW Batteries asset in Massachusetts with status Under construction.

2

Available financial measures include $1361/kW CapEx.

Market and operating context

ISO / market
ISO New England
Balancing authority
ISO New England Inc.
NERC region
NPCC
State rank
#31 of 58
National rank
#863 of 994

Why it matters

For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Solar Carver 1 Hybrid — verified asset snapshot

FieldValue
LocationPlymouth, Massachusetts
TechnologyBatteries, Solar Photovoltaic
Owner / parentSolar Carver 1, LLC
OperatorSolar Carver 1, LLC
GridISO New England
Plant ID63541
ISO / marketISO New England
Balancing authorityISO New England Inc.