Query
Solar Blythe 2
Type
Entity Briefing
Entity
Solar Blythe 2
Technology
solar
Summary generated
Oct 9, 2026
First saved
Date not recorded

Briefing on Solar Blythe 2

Entity Briefing

Summary generated Oct 9, 2026 (UTC).

Source dates used by this summary were not recorded.

20 MW
Capacity
Operating
Current status
2017
Operating since
1
Generators
21.6%
Capacity factor
38 GWh
Annual generation
Briefing/plantOperating

Solar Blythe 2 is a 20 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Solar Blythe 2 is reported in California since 2017 under Clearway Energy. Available operating and financial measures include 21.6% capacity factor and 38 GWh annual generation; $11.8/MWh reported energy value.

Location
Riverside, California
Technology
Solar Photovoltaic
Owner / parent
Clearway Energy
Operator
NRG Solar Blythe II LLC
Grid
CAISO (California)
Plant ID
60558

What stands out

1

Solar Blythe 2 is a 20 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 21.6% capacity factor and 38 GWh annual generation.

3

Available financial measures include $11.8/MWh energy value.

4

Latest linked story: “Clearway Energy, Inc. Seeks Shareholder Approval at Annual Meeting to Simplify Public Share Class Structure” (Investing News Network, 2026-03-09).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#231 of 992
National rank
#1800 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.