Sol Marina Energy Center BESS is a 57 MW Solar+Battery project in Texas, currently active.
Adapture Solar Development, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2032-12-30.
- Queue ID
- ERCOT-26INR0242
- Location
- Ellis, Texas
- Technology
- Solar+Battery
- Developer
- Adapture Solar Development, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 2427 Watermill - 2466 Big Onion
What stands out
Sol Marina Energy Center BESS is a 57 MW Solar+Battery project in Texas with status active.
Adapture Solar Development, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2032-12-30.
Latest linked story: “Invenergy brings Arizona portfolio to 600MWh+ with tenth commissioned project” (Energy-Storage.News, 2024-08-30).
Market and operating context
- Queue date
- 2023-10-25
- Proposed COD
- 2032-12-30
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters