Sol Marina Energy Center BESS
Type
Entity Briefing
Entity
Sol Marina Energy Center BESS
State
TN
Technology
battery
Generated
2026-10-19T16:22:29.247Z

Briefing on Sol Marina Energy Center BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
57 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2032-12-30
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Sol Marina Energy Center BESS is a 57 MW Solar+Battery project in Texas, currently active.

Adapture Solar Development, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2032-12-30.

Queue ID
ERCOT-26INR0242
Location
Ellis, Texas
Technology
Solar+Battery
Developer
Adapture Solar Development, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 2427 Watermill - 2466 Big Onion

What stands out

1

Sol Marina Energy Center BESS is a 57 MW Solar+Battery project in Texas with status active.

2

Adapture Solar Development, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2032-12-30.

4

Latest linked story: “Invenergy brings Arizona portfolio to 600MWh+ with tenth commissioned project” (Energy-Storage.News, 2024-08-30).

Market and operating context

Queue date
2023-10-25
Proposed COD
2032-12-30
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Sol Marina Energy Center BESS — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0242
LocationEllis, Texas
TechnologySolar+Battery
DeveloperAdapture Solar Development, LLC
Market / regionERCOT
Point of interconnectionTap 345kV 2427 Watermill - 2466 Big Onion
Queue date2023-10-25
Proposed COD2032-12-30