Briefing/projectactive
Soda Lake Solar 2 SLF is a 202 MW Solar+Battery project in Texas, currently active.
Crane II Solar Electric, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-12-01.
- Queue ID
- ERCOT-23INR0080
- Location
- Crane, Texas
- Technology
- Solar+Battery
- Developer
- Crane II Solar Electric, LLC
- Market / region
- ERCOT
- Point of interconnection
- 138 kV Soda Lake (#76026)
What stands out
1
Soda Lake Solar 2 SLF is a 202 MW Solar+Battery project in Texas with status active.
2
Crane II Solar Electric, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2027-12-01.
Market and operating context
- Queue date
- 2020-09-11
- Proposed COD
- 2027-12-01
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.