Snowflake A Solar and BESS is a 950 MW Batteries asset in Arizona, currently Planned.
Snowflake A Solar and BESS is reported in Arizona under Clenera DevCo LLC. Available operating and financial measures include $1544/kW reported CapEx.
- Location
- Navajo, Arizona
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Clenera DevCo LLC
- Operator
- Clenera DevCo LLC
- Grid
- Arizona Public Service Company
- Plant ID
- 69060
What stands out
Snowflake A Solar and BESS is a 950 MW Batteries asset in Arizona with status Planned.
Available financial measures include $1544/kW CapEx.
Latest linked story: “Enlight secures US$1.44 billion for Arizona hybrid PV plant with 1,900MWh BESS” (Energy-Storage.News, 2025-11-11).
Market and operating context
- Balancing authority
- Arizona Public Service Company
- NERC region
- WECC
- State rank
- #2 of 61
- National rank
- #12 of 994
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.