Briefing/plantOperating
Snowden is a 5 MW Conventional Hydroelectric asset in PJM Interconnection, currently Operating.
Snowden is reported in Virginia since 1987 under Town of Bedford - (VA). Available operating and financial measures include 31.7% capacity factor and 14 GWh annual generation; $2294/kW reported CapEx.
- Location
- Bedford, Virginia
- Technology
- Conventional Hydroelectric
- Owner / parent
- Town of Bedford - (VA)
- Operator
- Town of Bedford - (VA)
- Grid
- PJM Interconnection
- Plant ID
- 3821
What stands out
1
Snowden is a 5 MW Conventional Hydroelectric asset in Virginia with status Operating.
2
Latest annual operating measures report 31.7% capacity factor and 14 GWh annual generation.
3
Available financial measures include $2294/kW CapEx.
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #13 of 24
- National rank
- #885 of 1,462
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.