SMT Ironman Battery Storage Plant is a 304 MW Batteries asset in ERCOT (Texas), currently Operating.
SMT Ironman Battery Storage Plant is reported in Texas since 2025 under SMT Ironman BESS LLC. Available operating and financial measures include -0.9% capacity factor and -13 GWh annual generation; $1361/kW reported CapEx.
- Location
- Brazoria, Texas
- Technology
- Batteries
- Owner / parent
- SMT Ironman BESS LLC
- Operator
- SMT Ironman BESS LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 67737
What stands out
SMT Ironman Battery Storage Plant is a 304 MW Batteries asset in Texas with status Operating.
Latest annual operating measures report -0.9% capacity factor and -13 GWh annual generation.
Available financial measures include $1361/kW CapEx.
Latest linked story: “SMT Energy secures US$135 million for 160MW/320MWh ERCOT BESS” (Energy-Storage.News, 2025-02-28).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #27 of 344
- National rank
- #89 of 994
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.