Query
SMT Dallas III BESS
Type
Entity Briefing
Entity
SMT Dallas III BESS
State
TN
Technology
battery
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on SMT Dallas III BESS

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

10 MW
Capacity
Operating
Current status
2026
Operating since
1
Generators
Briefing/plantOperating

SMT Dallas III BESS is a 10 MW Batteries asset in ERCOT (Texas), currently Operating.

SMT Dallas III BESS is reported in Texas since 2026 under SMT Dallas III LLC. Available operating and financial measures include $1361/kW reported CapEx.

Location
Dallas, Texas
Technology
Batteries
Owner / parent
SMT Dallas III LLC
Operator
SMT Dallas III LLC
Grid
ERCOT (Texas)
Plant ID
69367

What stands out

1

SMT Dallas III BESS is a 10 MW Batteries asset in Texas with status Operating.

2

Available financial measures include $1361/kW CapEx.

Market and operating context

ISO / market
ERCOT (Texas)
State rank
#242 of 344
National rank
#662 of 994

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

SMT Dallas III BESS — verified asset snapshot

FieldValue
LocationDallas, Texas
TechnologyBatteries
Owner / parentSMT Dallas III LLC
OperatorSMT Dallas III LLC
GridERCOT (Texas)
Plant ID69367
ISO / marketERCOT (Texas)
State rank#242 of 344