Smith Lake Solar DC is a 402 MW Solar+Battery project in Texas, currently active.
Smith Lake Solar is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-29.
- Queue ID
- ERCOT-24INR0172
- Location
- Grimes, Texas
- Technology
- Solar+Battery
- Developer
- Smith Lake Solar
- Market / region
- ERCOT
- Point of interconnection
- TAP 345 KV 44645 SINGLETON - 44900 ZENITH Ckt #99
What stands out
Smith Lake Solar DC is a 402 MW Solar+Battery project in Texas with status active.
Smith Lake Solar is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-12-29.
Latest linked story: “Entergy Arkansas announces 250 MW solar facility near Osceola” (Lightsource bp, 2022-10-04).
Market and operating context
- Queue date
- 2022-02-07
- Proposed COD
- 2028-12-29
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.