Briefing on Smith Lake Solar DC

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
402 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-12-29
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Smith Lake Solar DC is a 402 MW Solar+Battery project in Texas, currently active.

Smith Lake Solar is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-29.

Queue ID
ERCOT-24INR0172
Location
Grimes, Texas
Technology
Solar+Battery
Developer
Smith Lake Solar
Market / region
ERCOT
Point of interconnection
TAP 345 KV 44645 SINGLETON - 44900 ZENITH Ckt #99

What stands out

1

Smith Lake Solar DC is a 402 MW Solar+Battery project in Texas with status active.

2

Smith Lake Solar is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-29.

4

Latest linked story: “Entergy Arkansas announces 250 MW solar facility near Osceola” (Lightsource bp, 2022-10-04).

Market and operating context

Queue date
2022-02-07
Proposed COD
2028-12-29
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Smith Lake Solar DC — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0172
LocationGrimes, Texas
TechnologySolar+Battery
DeveloperSmith Lake Solar
Market / regionERCOT
Point of interconnectionTAP 345 KV 44645 SINGLETON - 44900 ZENITH Ckt #99
Queue date2022-02-07