Briefing/projectactive
Sleepy Hollow BESS is a 123 MW Battery project in Texas, currently active.
Sleepy Hollow BESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-02-22.
- Queue ID
- ERCOT-26INR0327
- Location
- Throckmorton, Texas
- Technology
- Battery
- Developer
- Sleepy Hollow BESS, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138 kV 792 Murray - 6169 Paint Creek
What stands out
1
Sleepy Hollow BESS is a 123 MW Battery project in Texas with status active.
2
Sleepy Hollow BESS, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-02-22.
Market and operating context
- Queue date
- 2023-11-30
- Proposed COD
- 2028-02-22
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.