Briefing on Skull Creek Solar

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
137 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2027-05-16
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Skull Creek Solar is a 137 MW Solar project in Texas, currently active.

Skull Creek Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-05-16.

Queue ID
ERCOT-23INR0289
Location
Anderson, Texas
Technology
Solar
Developer
Skull Creek Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 3281 Tennessee Colony - 3499 Blackfoot Massey Lake Switch in TSP’s Pin Oak Switch - Long Lake Substation

What stands out

1

Skull Creek Solar is a 137 MW Solar project in Texas with status active.

2

Skull Creek Solar, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2027-05-16.

4

Latest linked story: “Meta, Zelestra Expand Renewable Energy Partnership With 176 MW Skull Creek Solar PPA in Texas” (Construction Review, 2026-02-28).

Market and operating context

Queue date
2021-05-28
Proposed COD
2027-05-16
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Skull Creek Solar — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0289
LocationAnderson, Texas
TechnologySolar
DeveloperSkull Creek Solar, LLC
Market / regionERCOT
Point of interconnectionTap 138kV 3281 Tennessee Colony - 3499 Blackfoot Massey Lake Switch in TSP’s Pin Oak Switch - Long Lake Substation
Queue date2021-05-28
Proposed COD2027-05-16