Skull Creek Solar is a 137 MW Solar project in Texas, currently active.
Skull Creek Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-05-16.
- Queue ID
- ERCOT-23INR0289
- Location
- Anderson, Texas
- Technology
- Solar
- Developer
- Skull Creek Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 3281 Tennessee Colony - 3499 Blackfoot Massey Lake Switch in TSP’s Pin Oak Switch - Long Lake Substation
What stands out
Skull Creek Solar is a 137 MW Solar project in Texas with status active.
Skull Creek Solar, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2027-05-16.
Latest linked story: “Meta, Zelestra Expand Renewable Energy Partnership With 176 MW Skull Creek Solar PPA in Texas” (Construction Review, 2026-02-28).
Market and operating context
- Queue date
- 2021-05-28
- Proposed COD
- 2027-05-16
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.