Briefing/projectactive
Sisters Solar is a 302 MW Solar+Battery project in Texas, currently active.
Oberon Solar LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-02-21.
- Queue ID
- ERCOT-21INR0265
- Location
- Ector, Texas
- Technology
- Solar+Battery
- Developer
- Oberon Solar LLC
- Market / region
- ERCOT
- Point of interconnection
- tapping the 345 kV line connecting Moss Switch (Bus# 1018) to Wolf Switching Station (Bus# 11010)
What stands out
1
Sisters Solar is a 302 MW Solar+Battery project in Texas with status active.
2
Oberon Solar LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2028-02-21.
Market and operating context
- Queue date
- 2019-02-28
- Proposed COD
- 2028-02-21
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.