Query
SIMON
Type
Entity Briefing
Entity
SIMON
Generated
2026-10-10T22:59:02.488Z

Briefing on SIMON

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
406 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2032-04-26
Proposed COD
C14
Queue phase
Briefing/projectactive

SIMON is a 406 MW Battery project in California, currently active.

The reported queue phase is C14. Proposed COD is 2032-04-26.

Queue ID
CAISO-2115
Location
Los Angeles, California
Technology
Battery
Market / region
CAISO
Point of interconnection
La Cienega Substation 230 kV

What stands out

1

SIMON is a 406 MW Battery project in California with status active.

2

The reported queue phase is C14; proposed COD is 2032-04-26.

Market and operating context

Queue date
2021-04-15
Proposed COD
2032-04-26
IA status
System Impact Study
Study phase
C14
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

SIMON — verified asset snapshot

FieldValue
Queue IDCAISO-2115
LocationLos Angeles, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionLa Cienega Substation 230 kV
Queue date2021-04-15
Proposed COD2032-04-26
IA statusSystem Impact Study