Query
Silver State Solar Power South
Type
Entity Briefing
Entity
Silver Star repower
ISO/RTO
spp
Generated
2026-10-07T23:10:25.489Z

Briefing on Silver Star repower

Entity Briefing
Generated Oct 7, 2026·Dataset freshness not reported
active
Current status
Wind
Technology
ERCOT
Market / region
2026-07-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Silver Star repower is a 0 MW Wind project in Texas, currently active.

Silver Star I Power Partners, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-07-01.

Queue ID
ERCOT-18INR0064
Location
Eastland, Texas
Technology
Wind
Developer
Silver Star I Power Partners, LLC
Market / region
ERCOT
Point of interconnection
1642 Flat Creek 138kV

What stands out

1

Silver Star repower is a 0 MW Wind project in Texas with status active.

2

Silver Star I Power Partners, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-07-01.

Market and operating context

Queue date
2017-04-05
Proposed COD
2026-07-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Silver Star repower — verified asset snapshot

FieldValue
Queue IDERCOT-18INR0064
LocationEastland, Texas
TechnologyWind
DeveloperSilver Star I Power Partners, LLC
Market / regionERCOT
Point of interconnection1642 Flat Creek 138kV
Queue date2017-04-05
Proposed COD2026-07-01