Briefing/projectactive
Silver Star repower is a 0 MW Wind project in Texas, currently active.
Silver Star I Power Partners, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-07-01.
- Queue ID
- ERCOT-18INR0064
- Location
- Eastland, Texas
- Technology
- Wind
- Developer
- Silver Star I Power Partners, LLC
- Market / region
- ERCOT
- Point of interconnection
- 1642 Flat Creek 138kV
What stands out
1
Silver Star repower is a 0 MW Wind project in Texas with status active.
2
Silver Star I Power Partners, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-07-01.
Market and operating context
- Queue date
- 2017-04-05
- Proposed COD
- 2026-07-01
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.