Query
SILVER RIDGE MOUNT SIGNAL
Type
Entity Briefing
Entity
SILVER RIDGE MOUNT SIGNAL
State
MT
Generated
2026-10-10T21:55:53.460Z

Briefing on SILVER RIDGE MOUNT SIGNAL

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
750 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2027-06-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

SILVER RIDGE MOUNT SIGNAL is a 750 MW Solar+Battery project in California, currently active.

The reported queue phase is IA Executed. Proposed COD is 2027-06-01.

Queue ID
CAISO-124
Location
Imperial, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Imperial Valley Substation 230 kV

What stands out

1

SILVER RIDGE MOUNT SIGNAL is a 750 MW Solar+Battery project in California with status active.

2

The reported queue phase is IA Executed; proposed COD is 2027-06-01.

Market and operating context

Queue date
2006-08-22
Proposed COD
2027-06-01
IA status
IA Executed
Study phase
IA Executed
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

SILVER RIDGE MOUNT SIGNAL — verified asset snapshot

FieldValue
Queue IDCAISO-124
LocationImperial, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionImperial Valley Substation 230 kV
Queue date2006-08-22
Proposed COD2027-06-01
IA statusIA Executed