Query
Silver Hills Windpower
Type
Entity Briefing
Entity
Silver Hills Windpower
Generated
2026-10-19T08:26:26.251Z

Briefing on Silver Hills Windpower

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
54 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2029-06-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Silver Hills Windpower is a 54 MW Wind project in Texas, currently active.

Silver Hills Windpower, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-06-01.

Queue ID
ERCOT-27INR0512
Location
Howard, Texas
Technology
Wind
Developer
Silver Hills Windpower, LLC
Market / region
ERCOT
Point of interconnection
10066 Prong Moss Switch 138kV

What stands out

1

Silver Hills Windpower is a 54 MW Wind project in Texas with status active.

2

Silver Hills Windpower, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-06-01.

Market and operating context

Queue date
2025-04-21
Proposed COD
2029-06-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Silver Hills Windpower — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0512
LocationHoward, Texas
TechnologyWind
DeveloperSilver Hills Windpower, LLC
Market / regionERCOT
Point of interconnection10066 Prong Moss Switch 138kV
Queue date2025-04-21
Proposed COD2029-06-01