Query
Silver Dollar Solar
Type
Entity Briefing
Entity
Silver Dollar Solar
Generated
2026-10-06T12:37:34.858Z

Briefing on Silver Dollar Solar

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
302 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-04-28
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Silver Dollar Solar is a 302 MW Solar+Battery project in Texas, currently active.

Silver Dollar Solar Project, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-28.

Queue ID
ERCOT-27INR0186
Location
Freestone, Texas
Technology
Solar+Battery
Developer
Silver Dollar Solar Project, LLC
Market / region
ERCOT
Point of interconnection
Tap 345 kV Big Brown 3380 to Navarro 68091 ckt#2

What stands out

1

Silver Dollar Solar is a 302 MW Solar+Battery project in Texas with status active.

2

Silver Dollar Solar Project, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-04-28.

Market and operating context

Queue date
2024-06-03
Proposed COD
2028-04-28
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Silver Dollar Solar — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0186
LocationFreestone, Texas
TechnologySolar+Battery
DeveloperSilver Dollar Solar Project, LLC
Market / regionERCOT
Point of interconnectionTap 345 kV Big Brown 3380 to Navarro 68091 ckt#2
Queue date2024-06-03
Proposed COD2028-04-28